Olkiluoto 1 (OL1) right now

Current power

895MW/ 890 MW
100% utilization

Last updated:

Status

Operational

Status and output

Olkiluoto 1

Eurajoki, Satakunta
Operational
100%

Current power

895

/ 890 MW

Reactor typeBoiling water reactorA boiling water reactor (BWR) allows water to boil directly in the reactor, creating steam that drives the turbines. This is a simpler design but requires the turbines to handle radioactive steam.
Reactor modelASEA-Atom BWR-2500A boiling water reactor designed by Swedish ASEA-Atom in Västerås and built at Forsmark 1–2 and Olkiluoto 1–2 around 1980. Like all ASEA-Atom designs, it circulates water with pumps mounted inside the reactor vessel instead of in external loops.
Commercial operation

Oct 10, 1979

Olkiluoto 1 at a glance

Location
Eurajoki, Satakunta, Finland
Net capacity
890 MW
Operator
Teollisuuden Voima Oyj (TVO)

Find this dashboard useful?

I run it on my own time and pay for the hosting myself. A coffee helps keep the data flowing.

Live reactor data, free for everyone

The dashboard checks for new data every 5 minutes, around the clock. A coffee helps pay for the hosting that keeps it running.

Saves you checking every operator's site?

Every operating reactor in the Nordics in one place. A coffee helps keep it running.

Buy me a coffee

Know when things change

Would you use notifications for reactors you follow, output crossing a threshold you choose, or changes to expected restart dates?

Exploring this feature — alerts aren’t available yet.

Planned outages at Olkiluoto 1 2027–2029

Outages the plants have announced to Nord Pool in advance, such as annual maintenance, refuelling and planned tests. Dates can move if the work goes faster or slower than planned.

2027

  1. Apr 4 – 13, 2027

    Yearly maintenance.

    9 days

2028

  1. May 28 – Jun 16, 2028

    Yearly maintenance

    19 days

2029

  1. May 13 – 23, 2029

    Yearly maintenance

    10 days

About Olkiluoto 1

Olkiluoto 1, or OL1, is an 890 MW boiling water reactor on Olkiluoto island in Eurajoki, Satakunta, run by Teollisuuden Voima (TVO). It was designed by Swedish ASEA-Atom and entered commercial operation in October 1979, making it the oldest reactor at Olkiluoto. OL1 and its twin OL2 hold operating licences until the end of 2038. Each spring one of the two has a short refuelling outage and the other a longer maintenance outage.

Where is Olkiluoto 1? Map and location

Olkiluoto 1 is at the Olkiluoto nuclear power plant. Olkiluoto is on Olkiluoto island in Eurajoki, in the Satakunta region of western Finland, on the Gulf of Bothnia about 12 km north of Rauma. The map shows Olkiluoto and Finland's other nuclear power plant.

Eurajoki, Satakunta, Finland · 61.2367° N, 21.4425° E

Map showing where Olkiluoto is, with Finland's other nuclear power plant

Frequently asked questions about Olkiluoto 1

Is Olkiluoto 1 running right now?

This page shows OL1's current output from TVO's production data, refreshed every five minutes. If the reactor is offline or at reduced output, the reason is shown from TVO's outage notices on Nord Pool.

When will Olkiluoto 1 restart?

During an outage, the expected restart time is the end date in the outage notice TVO publishes on Nord Pool, shown on this page with the reactor's status. TVO updates the notice when plans change, so the date can move.

How powerful is Olkiluoto 1?

Olkiluoto 1 has a net capacity of 890 MW, the same as Olkiluoto 2. Olkiluoto 3 has 1,600 MW.

Other reactors at Olkiluoto

Olkiluoto 2

Eurajoki, Satakunta
Reduced output
83%

Current power

739

/ 890 MW

Reactor typeBoiling water reactorA boiling water reactor (BWR) allows water to boil directly in the reactor, creating steam that drives the turbines. This is a simpler design but requires the turbines to handle radioactive steam.
Reactor modelASEA-Atom BWR-2500A boiling water reactor designed by Swedish ASEA-Atom in Västerås and built at Forsmark 1–2 and Olkiluoto 1–2 around 1980. Like all ASEA-Atom designs, it circulates water with pumps mounted inside the reactor vessel instead of in external loops.
Commercial operation

Jul 10, 1982

Planned
ReasonGenerator rotor limitation
Expected completionApr 18, 2027

Olkiluoto 3

Eurajoki, Satakunta
Ramping down
27%

Current power

434

/ 1,600 MW

Reactor typePressurized water reactorA pressurized water reactor (PWR) uses pressurized water as a coolant to prevent boiling. This water transfers heat to a secondary circuit that drives the turbines, ensuring that radioactive water never reaches the turbines.
Reactor modelAreva EPRThe European Pressurized Reactor, a third-generation design developed by French Areva and German Siemens. Olkiluoto 3 was the first EPR ever ordered; construction began in 2005, and after long delays it entered regular operation in 2023 as Europe's most powerful reactor.
Commercial operation

May 1, 2023

Planned(2)
ReasonOL3 output will be reduced to approximately 60% power from 25 November 2026 at 01:00 due to a valve fault in a turbine plant process system. The unit will not be available for power regulation during the power reduction.
Expected completionNov 26, 2026
Olkiluoto nuclear power plant

Data sources and reliability

All power data presented on this page comes from official data sources. Power data for Olkiluoto 1–3 comes directly from Teollisuuden Voima Oyj (TVO), while Finland's total nuclear generation comes from Fingrid. Loviisa's combined value is calculated by subtracting Olkiluoto 1–3 from Fingrid's total. Data related to maintenance and outages comes from the Nord Pool UMM platform (Urgent Market Messages), a European platform for sharing information about maintenance and outages on the power grid. This ensures accurate, up-to-date information about Finland's nuclear power generation.

Data sources include Teollisuuden Voima Oyj (TVO), Fingrid Open Data, and the Nord Pool UMM Platform, providing comprehensive coverage of all Finnish nuclear reactors. Fingrid data is used under CC BY 4.0, and the Loviisa calculation is a modification of the source data made by Nordic Nuclear Power.