Status and output
Olkiluoto 1
Current power
895
/ 890 MW
Oct 10, 1979
Olkiluoto 1 at a glance
- Power plant
- Olkiluoto nuclear power plant
- Location
- Eurajoki, Satakunta, Finland
- Net capacity
- 890 MW
- Operator
- Teollisuuden Voima Oyj (TVO)
Find this dashboard useful?
I run it on my own time and pay for the hosting myself. A coffee helps keep the data flowing.
Live reactor data, free for everyone
The dashboard checks for new data every 5 minutes, around the clock. A coffee helps pay for the hosting that keeps it running.
Saves you checking every operator's site?
Every operating reactor in the Nordics in one place. A coffee helps keep it running.
Know when things change
Would you use notifications for reactors you follow, output crossing a threshold you choose, or changes to expected restart dates?
Exploring this feature — alerts aren’t available yet.
Planned outages at Olkiluoto 1 2027–2029
Outages the plants have announced to Nord Pool in advance, such as annual maintenance, refuelling and planned tests. Dates can move if the work goes faster or slower than planned.
2027
- Apr 4 – 13, 20279 days
Yearly maintenance.
2028
- May 28 – Jun 16, 202819 days
Yearly maintenance
2029
- May 13 – 23, 202910 days
Yearly maintenance
About Olkiluoto 1
Olkiluoto 1, or OL1, is an 890 MW boiling water reactor on Olkiluoto island in Eurajoki, Satakunta, run by Teollisuuden Voima (TVO). It was designed by Swedish ASEA-Atom and entered commercial operation in October 1979, making it the oldest reactor at Olkiluoto. OL1 and its twin OL2 hold operating licences until the end of 2038. Each spring one of the two has a short refuelling outage and the other a longer maintenance outage.
Where is Olkiluoto 1? Map and location
Olkiluoto 1 is at the Olkiluoto nuclear power plant. Olkiluoto is on Olkiluoto island in Eurajoki, in the Satakunta region of western Finland, on the Gulf of Bothnia about 12 km north of Rauma. The map shows Olkiluoto and Finland's other nuclear power plant.
Eurajoki, Satakunta, Finland · 61.2367° N, 21.4425° E
Frequently asked questions about Olkiluoto 1
Is Olkiluoto 1 running right now?
This page shows OL1's current output from TVO's production data, refreshed every five minutes. If the reactor is offline or at reduced output, the reason is shown from TVO's outage notices on Nord Pool.
When will Olkiluoto 1 restart?
During an outage, the expected restart time is the end date in the outage notice TVO publishes on Nord Pool, shown on this page with the reactor's status. TVO updates the notice when plans change, so the date can move.
How powerful is Olkiluoto 1?
Olkiluoto 1 has a net capacity of 890 MW, the same as Olkiluoto 2. Olkiluoto 3 has 1,600 MW.
Other reactors at Olkiluoto
Olkiluoto 2
Current power
739
/ 890 MW
Jul 10, 1982
Message details
Olkiluoto 3
Current power
434
/ 1,600 MW
May 1, 2023
All messages(2)
Data sources and reliability
All power data presented on this page comes from official data sources. Power data for Olkiluoto 1–3 comes directly from Teollisuuden Voima Oyj (TVO), while Finland's total nuclear generation comes from Fingrid. Loviisa's combined value is calculated by subtracting Olkiluoto 1–3 from Fingrid's total. Data related to maintenance and outages comes from the Nord Pool UMM platform (Urgent Market Messages), a European platform for sharing information about maintenance and outages on the power grid. This ensures accurate, up-to-date information about Finland's nuclear power generation.
Data sources include Teollisuuden Voima Oyj (TVO), Fingrid Open Data, and the Nord Pool UMM Platform, providing comprehensive coverage of all Finnish nuclear reactors. Fingrid data is used under CC BY 4.0, and the Loviisa calculation is a modification of the source data made by Nordic Nuclear Power.