Forsmark 3 right now

Current power

1,173MW/ 1,172 MW
100% utilization

Last updated:

Status

Operational

Status and output

Forsmark 3

Östhammar, Uppsala län
Operational
100%

Current power

1,173

/ 1,172 MW

Reactor typeBoiling water reactorA boiling water reactor (BWR) allows water to boil directly in the reactor, creating steam that drives the turbines. This is a simpler design but requires the turbines to handle radioactive steam.
Reactor modelASEA-Atom BWR-3000ASEA-Atom's largest and last boiling water reactor design, built only at Forsmark 3 and Oskarshamn 3, both in service since 1985. After an uprate, Oskarshamn 3 is one of the most powerful boiling water reactors in the world.
Commercial operation

Aug 18, 1985

Forsmark 3 at a glance

Location
Östhammar, Uppsala län, Sweden
Net capacity
1,172 MW
Operator
Forsmarks Kraftgrupp AB
Owners

Find this dashboard useful?

I run it on my own time and pay for the hosting myself. A coffee helps keep the data flowing.

Live reactor data, free for everyone

The dashboard checks for new data every 5 minutes, around the clock. A coffee helps pay for the hosting that keeps it running.

Saves you checking every operator's site?

Every operating reactor in the Nordics in one place. A coffee helps keep it running.

Buy me a coffee

Know when things change

Would you use notifications for reactors you follow, output crossing a threshold you choose, or changes to expected restart dates?

Exploring this feature — alerts aren’t available yet.

Planned outages at Forsmark 3 2027–2029

Outages the plants have announced to Nord Pool in advance, such as annual maintenance, refuelling and planned tests. Dates can move if the work goes faster or slower than planned.

2027

  1. May 2 – Jun 28, 2027

    Yearly outage.

    57 days

2028

  1. Sep 3 – Oct 29, 2028

    Yearly outage

    56 days

2029

  1. Jul 1 – 19, 2029

    Yearly outage.

    19 days

About Forsmark 3

Forsmark 3 is a 1,172 MW boiling water reactor at Forsmark nuclear power plant on the Uppland coast in Östhammar municipality. It entered commercial operation in August 1985 and is Forsmark's largest reactor. It is built to ASEA-Atom's last and largest design, the same as Oskarshamn 3. The plant is run by Forsmarks Kraftgrupp AB, which is majority owned by Vattenfall.

Where is Forsmark 3? Map and location

Forsmark 3 is at the Forsmark nuclear power plant. Forsmark is on the Baltic coast in Östhammar Municipality, Uppsala County, in northern Uppland about 120 km north of Stockholm. The map shows Forsmark and Sweden's other nuclear power plants.

Östhammar, Uppsala län, Sweden · 60.4033° N, 18.1667° E

Map showing where Forsmark is, with Sweden's other nuclear power plants

Frequently asked questions about Forsmark 3

Is Forsmark 3 running right now?

This page shows Forsmark 3's current output from Vattenfall's production data, refreshed every five minutes. If the reactor is offline or at reduced output, the reason is shown from the operator's outage notices on Nord Pool.

When will Forsmark 3 restart?

During an outage, the expected restart time is the end date in the outage notice Forsmark publishes on Nord Pool, shown on this page with the reactor's status. The operator updates the notice when plans change, so the date can move.

How powerful is Forsmark 3?

Forsmark 3 has a net capacity of 1,172 MW, the most of Forsmark's three reactors. Forsmark 1 has 1,103 MW and Forsmark 2 1,121 MW.

Other reactors at Forsmark

Forsmark 1

Östhammar, Uppsala län
Reduced output
45%

Current power

500

/ 1,103 MW

Reactor typeBoiling water reactorA boiling water reactor (BWR) allows water to boil directly in the reactor, creating steam that drives the turbines. This is a simpler design but requires the turbines to handle radioactive steam.
Reactor modelASEA-Atom BWR-2500A boiling water reactor designed by Swedish ASEA-Atom in Västerås and built at Forsmark 1–2 and Olkiluoto 1–2 around 1980. Like all ASEA-Atom designs, it circulates water with pumps mounted inside the reactor vessel instead of in external loops.
Commercial operation

Dec 10, 1980

Planned
ReasonYearly outage, followed by additional maintenance work at turbine 11
Expected completionNov 26, 2026

Forsmark 2

Östhammar, Uppsala län
Operational
100%

Current power

1,129

/ 1,121 MW

Reactor typeBoiling water reactorA boiling water reactor (BWR) allows water to boil directly in the reactor, creating steam that drives the turbines. This is a simpler design but requires the turbines to handle radioactive steam.
Reactor modelASEA-Atom BWR-2500A boiling water reactor designed by Swedish ASEA-Atom in Västerås and built at Forsmark 1–2 and Olkiluoto 1–2 around 1980. Like all ASEA-Atom designs, it circulates water with pumps mounted inside the reactor vessel instead of in external loops.
Commercial operation

Jul 7, 1981

Forsmark nuclear power plant

Data sources and reliability

All power data presented on this page comes directly from official operators. Data related to maintenance and outages comes from the Nord Pool UMM platform (Urgent Market Messages), a European platform for sharing information about maintenance and outages on the power grid. This ensures accurate, up-to-date information about Sweden's nuclear power generation.

Data sources include Vattenfall AB, OKG (Oskarshamn Kraftgrupp), and the Nord Pool UMM Platform, providing comprehensive coverage of all Swedish nuclear reactors.