Map of nuclear power plants in Sweden

Where Sweden's three operating nuclear power plants are – Ringhals, Forsmark and Oskarshamn – and how each reactor is running right now, plus where the closed plants and the nuclear waste facilities are. Right now the reactors produce 4,789 of 7,054 MW, and 5 of 6 are running.

Last updated:

Map of nuclear power plants in Sweden: Ringhals, Forsmark, and Oskarshamn

Sweden's nuclear power plants

Sweden's three operating nuclear power plants are all on the coast in the southern half of the country, since the reactors are cooled with seawater. Ringhals is on the Värö peninsula in Varberg Municipality, Halland County, on the Kattegat on the west coast. Forsmark is in Östhammar Municipality, Uppsala County, on the Baltic coast of northern Uppland. Oskarshamn is on the Simpevarp peninsula in Oskarshamn Municipality, Kalmar County, on the Baltic coast of Småland. The map shows where they are and whether they are running right now.

Operating nuclear power plants

  • Ringhals nuclear power plant

    Varberg, Hallands län, Sweden · 57.2597° N, 12.1108° E

    Ringhals is on the Värö peninsula in Varberg Municipality, Halland County, on the Kattegat about 20 km north of Varberg and 50 km south of Gothenburg.

  • Forsmark nuclear power plant

    Östhammar, Uppsala län, Sweden · 60.4033° N, 18.1667° E

    Forsmark is on the Baltic coast in Östhammar Municipality, Uppsala County, in northern Uppland about 120 km north of Stockholm.

  • Oskarshamn nuclear power plant

    Oskarshamn, Kalmar län, Sweden · 57.4156° N, 16.6711° E

    The Oskarshamn plant is on the Simpevarp peninsula in Oskarshamn Municipality, Kalmar County, on the Baltic coast about 20 km north of the town of Oskarshamn.

Closed nuclear power plants and reactors

  • Barsebäck Nuclear Power Plant

    Kävlinge Municipality, Skåne

    Two boiling water reactors on the Øresund. Barsebäck 1 entered service in 1975 and closed on 30 November 1999; Barsebäck 2 entered service in 1977 and closed on 31 May 2005. The reactors are being dismantled, and the radiological dismantling is expected to finish in 2028.

  • Ringhals 1 and 2

    Värö peninsula, Varberg Municipality

    Ringhals' two oldest reactors: Ringhals 2 closed on 30 December 2019 and Ringhals 1 on 31 December 2020. Dismantling began in spring 2024 and is expected to take almost ten years. Ringhals 3 and 4 on the same site are in operation.

  • Oskarshamn 1 and 2

    Simpevarp peninsula, Oskarshamn Municipality

    Oskarshamn 2 stood idle from 2013; its owners decided in 2015 not to restart it, and it formally closed in December 2016. Oskarshamn 1 last ran on 17 June 2017 and was shut down for good two days later. The radiological dismantling is expected to finish in 2028.

  • Ågesta nuclear power plant

    Huddinge Municipality, Stockholm County

    Sweden's first nuclear power plant, a small heavy-water reactor in a rock cavern near Farsta, which from 1964 to 1974 supplied 55 MW of district heating to Farsta and 10 MW of electricity. It closed on 2 June 1974, and its dismantling was completed in 2025.

  • Marviken power plant

    Vikbolandet, Norrköping Municipality

    A heavy-water reactor built from 1965 but never loaded with nuclear fuel: the government stopped the project on 27 May 1970. Its turbine was later driven by an oil-fired boiler as reserve power, and reactor-safety experiments were run there from 1972 to 1985.

Nuclear waste storage and repositories

  • SFR, the final repository for short-lived radioactive waste

    Forsmark, Östhammar Municipality

    SKB's repository for low- and intermediate-level waste from running and dismantling the nuclear power plants, in rock caverns under the seabed at Forsmark. In operation since 1988. Blasting for an extension with six new vaults began in December 2024.

  • Spent fuel repository (Kärnbränsleförvaret)

    Forsmark, Östhammar Municipality

    SKB's final repository for spent nuclear fuel, about 500 metres down in the bedrock. The government granted its permit on 27 January 2022, and construction began on 15 January 2025. Disposal of fuel is expected to begin in the 2030s.

  • Clab, the interim storage for spent fuel

    Simpevarp, Oskarshamn Municipality

    The central interim storage for spent fuel from the Swedish nuclear power plants, in operation since 1985 and holding just over 8,000 tonnes of fuel. Next to it SKB plans an encapsulation plant, where the fuel is to be sealed in canisters before it goes to the repository at Forsmark.

Planned and cancelled nuclear projects

  • New reactors on the Värö peninsula

    Ringhals, Varberg Municipality

    Videberg Kraft, set up by Vattenfall, plans three Rolls-Royce SMR small modular reactors of 470 MW each next to the closed Ringhals 1 and 2. The supplier was chosen in June 2026, and the state is to own 60 percent of the company. Consultations ahead of the permit application are under way.

  • Applications for new nuclear power plants

    Five sites

    Between March and August 2026 the Swedish government received applications to build new nuclear power plants at five sites: Målma in Valdemarsvik Municipality (Kärnfull Next), Norrsundet in Gävle Municipality and Untra in Tierp Municipality (Blykalla), Studsvik in Nyköping Municipality (Studsvik) and Barsebäck in Kävlinge Municipality (Nordic Baseload Power). All are under review by the government.