Ringhals 3 right now

Current power

0MW/ 1,074 MW
0% utilization

Last updated:

Status

Maintenance

Status and output

Ringhals 3

Varberg, Hallands län
Maintenance
0%

Current power

0

/ 1,074 MW

Reactor typePressurized water reactorA pressurized water reactor (PWR) uses pressurized water as a coolant to prevent boiling. This water transfers heat to a secondary circuit that drives the turbines, ensuring that radioactive water never reaches the turbines.
Reactor modelWestinghouse 3-loop PWRAn American pressurized water reactor design from Westinghouse in which three cooling loops, each with its own steam generator, carry heat away from the reactor. Ringhals 3 and 4 are the only operating Swedish reactors not designed by ASEA-Atom.
Commercial operation

Sep 9, 1981

Planned
ReasonDelayed startup after yearly maintenance.
Expected completionDec 20, 2026

Ringhals 3 at a glance

Location
Varberg, Hallands län, Sweden
Net capacity
1,074 MW
Operator
Ringhals AB
Owners

Find this dashboard useful?

I run it on my own time and pay for the hosting myself. A coffee helps keep the data flowing.

Live reactor data, free for everyone

The dashboard checks for new data every 5 minutes, around the clock. A coffee helps pay for the hosting that keeps it running.

Saves you checking every operator's site?

Every operating reactor in the Nordics in one place. A coffee helps keep it running.

Buy me a coffee

Know when things change

Would you use notifications for reactors you follow, output crossing a threshold you choose, or changes to expected restart dates?

Exploring this feature — alerts aren’t available yet.

Planned outages at Ringhals 3 2026–2029

Outages the plants have announced to Nord Pool in advance, such as annual maintenance, refuelling and planned tests. Dates can move if the work goes faster or slower than planned.

2026

  1. May 4 – Dec 20, 2026
    Ringhals 3Ongoing

    Delayed startup after yearly maintenance.

    25 days left

2027

  1. Mar 16, 2027, 10:00 – 10:30 AM
    Ringhals 3Reduced output

    Planned test

    30 minutes
  2. Mar 20, 2027, 10:00 – 10:30 AM

    Planned test

    30 minutes
  3. May 19 – Jun 20, 2027

    Yearly maintenance

    33 days

2028

  1. May 17 – Jun 29, 2028

    Yearly maintenance

    44 days

2029

  1. May 16 – Jun 23, 2029

    Yearly maintenance.

    39 days

About Ringhals 3

Ringhals 3 is a 1,074 MW pressurized water reactor of the Westinghouse three-loop design at Ringhals nuclear power plant in Varberg municipality, Halland. It entered commercial operation in September 1981 and is run by Ringhals AB, which is owned by Vattenfall and Uniper. Since Ringhals 1 and 2 closed in 2020 and 2019, Ringhals 3 and its twin Ringhals 4 are the plant's only reactors in operation. Vattenfall plans to run both for at least 60 years, into the 2040s.

Where is Ringhals 3? Map and location

Ringhals 3 is at the Ringhals nuclear power plant. Ringhals is on the Värö peninsula in Varberg Municipality, Halland County, on the Kattegat about 20 km north of Varberg and 50 km south of Gothenburg. The map shows Ringhals and Sweden's other nuclear power plants.

Varberg, Hallands län, Sweden · 57.2597° N, 12.1108° E

Map showing where Ringhals is, with Sweden's other nuclear power plants

Frequently asked questions about Ringhals 3

Is Ringhals 3 running right now?

This page shows Ringhals 3's current output from Vattenfall's production data, refreshed every five minutes. If the reactor is offline or at reduced output, the reason is shown from the operator's outage notices on Nord Pool.

When will Ringhals 3 restart?

During an outage, the expected restart time is the end date in the outage notice Ringhals AB publishes on Nord Pool, shown on this page with the reactor's status. The operator updates the notice when plans change, so the date can move.

How powerful is Ringhals 3?

Ringhals 3 has a net capacity of 1,074 MW, which makes it the smaller of Ringhals' two operating reactors. Ringhals 4 has 1,134 MW.

Other reactors at Ringhals

Ringhals 4

Varberg, Hallands län
Ramping up
48%

Current power

547

/ 1,134 MW

Reactor typePressurized water reactorA pressurized water reactor (PWR) uses pressurized water as a coolant to prevent boiling. This water transfers heat to a secondary circuit that drives the turbines, ensuring that radioactive water never reaches the turbines.
Reactor modelWestinghouse 3-loop PWRAn American pressurized water reactor design from Westinghouse in which three cooling loops, each with its own steam generator, carry heat away from the reactor. Ringhals 3 and 4 are the only operating Swedish reactors not designed by ASEA-Atom.
Commercial operation

Nov 21, 1983

Ringhals nuclear power plant

Data sources and reliability

All power data presented on this page comes directly from official operators. Data related to maintenance and outages comes from the Nord Pool UMM platform (Urgent Market Messages), a European platform for sharing information about maintenance and outages on the power grid. This ensures accurate, up-to-date information about Sweden's nuclear power generation.

Data sources include Vattenfall AB, OKG (Oskarshamn Kraftgrupp), and the Nord Pool UMM Platform, providing comprehensive coverage of all Swedish nuclear reactors.